The following is being proposed for preliminary review and comment only:
1. For Preliminary Review Only: Revision and Deletion of Requirements to Indicate that Sewing Machines, Flatirons, Toys Operated with Water, and Toys Operated with a Gas or Liquid Under Pressure are not Covered by UL 696
2. For Preliminary Review Only: Revision of Requirements Regarding Power-On Indication
3. For Preliminary Review Only: Revision of Table 19.1 to Clarify the Number of Samples Required for Performance Tests
4. For Preliminary Review Only: Revision of Requirements for the Classification of the Surfaces of a Toy
5. For Preliminary Review Only: Revision of 35.2.1 to Remove "Recommended" from Marking Requirement
6. For Preliminary Review Only: Addition of Overheating Protection Requirements
7. For Preliminary Review Only: Addition of Accessibility Requirements to Address Entrapment
8. For Preliminary Review Only: Revision of Requirements to Address Toys Provided with Accessories
9. For Preliminary Review Only: Revision of the Power-Supply Connection Requirements in Section 17
10. For Preliminary Review Only: Revision of the Temperature Test Requirements of Section 25
11. For Preliminary Review Only: Revision of Abnormal Operations Test Requirements in Section 28
12. For Preliminary Review Only: Revision of Marking Requirements
13. For Preliminary Review Only: Addition of Endurance Test Requirements