The following changes in requirements are being proposed:
1. For Preliminary Review Only: Open Holes in Transformer Enclosures
2. For Preliminary Review Only: Addition of GTO 5, 10, 15 into Retention Testing Requirements
3. For Preliminary Review Only: Neon Electrode Enclosure Length Requirement Clarification
4. For Preliminary Review Only: Retention Test Requirement
5. For Preliminary Review Only: Retention Test Between GTO Cable with Integral Sleeve & Neon Electrode Enclosure
6. For Preliminary Review Only: Deletion of Obsolete Wire Types
7. For Preliminary Review Only: Editorial Corrections