Subject 982

Bulletin Dated: December 21, 2007

SUMMARY OF TOPICS

The following changes in requirements are being proposed:

1. Testing Of Parts Subject (And Not Subject) To Flexing - Revisions To Clarify Requirements In Sections 41 And 42 Relative To Resistance To Moisture

2. Centrifugal Juicers - Clarification Of Test Methods In Sections 50

3. Battery-Operated Appliances - Revisions To 36.20 Relative To Temperature Test Method

4. Switch Ratings Relative To The Switch Overload And Endurance Tests

5. Revisions To Requirements Related To A Motor Control Off Switch

6. Revisions To Clarify The Operating Conditions During Continuous Operation And Abnormal Testing Of Manual And Auto-Reset Motor Protectors