The following changes in requirements are being proposed:
1. New Requirements Regarding Inlets for Transfer Switches
2. New Section Covering Power Input Panels
3. Revisions to Enclosure References
4. Relocating the Conduit Hub Secureness Test from the Construction Section to the Performance Section
5. Clarification of Operating Mechanism States
6. Revisions to Optional Standby Requirements
7. New Section Covering Transformer Grounding
8. Clarification of Disconnecting Means Requirements Clarification of Disconnecting Means Requirements to Correlate 19.9 with NFPA 70-445.18
9. Clarification of Service Entrance Requirements
10. Editorial Corrections