The following changes in requirements are being proposed:
1. Reduction of the Assembly Jacket Thickness Under Armor for Multiconductor Cable
2. Correction of the Inadvertent Deletion of "Nonshielded" from the Scope
3. Correction to the Performance Criteria for the FT4/IEEE 1202 Vertical-Tray Flame Test