Subject 1699

Bulletin Dated: July 27, 2007

SUMMARY OF TOPICS

The following is being proposed for preliminary review and comment only:

1. For Preliminary Review Only: Eliminating AFCI Trip During High Voltage Conditioning Cycle (PR7255)

2. For Preliminary Review Only: Carbonized Path Arc Interruption Test (PR7256)

3. For Preliminary Review Only: Using SPT-2 Wire Only With 60°C Rated Insulation (PR7257)

4. For Preliminary Review Only: Correcting Titles of Figure SA12.1 and Figure SA12.2 (PR7258)

5. For Preliminary Review Only: Limiting of Applicability of Clearing Times Specified for 120V AFCIs to Testing 240V AFCIs (PR7259)

6. For Preliminary Review Only: Defining What to do if Arcing Lasts Less than the Specified Clearing Time (PR7260)