Subject 1699

Bulletin Dated: March 21, 2008

SUMMARY OF TOPICS

The following topics are being recirculated:

1. Eliminating AFCI Trip During High Voltage Conditioning Cycle (PR7255)

2. Carbonized Path Arc Interruption Test (PR7256)

3. Using SPT-2 Wire Only With 60°C Rated Insulation (PR7257)

4. Correcting Titles of Figure SA12.1 and Figure SA12.2 (PR7258)

6. Defining What to do if Arcing Lasts Less than the Specified Clearing Time (PR7260)