Subject 2006

Bulletin Dated: June 12, 2009

SUMMARY OF TOPICS

The following changes in requirements to the Standard for Halon 1211 Recovery/Recharge Equipment, UL 2006, are being proposed:

1. Add requirements for the supply connections of permanently-connected equipment

2. Delete requirements for obsolete AF and CF wiring types

3. Clarify requirements for temperature controls

4. Add a requirement for interlock switches/controls

5. Add requirements for protective electronic circuits for motors

6. Revisions to update references throughout the standard